Files
sx/tests/expected
agra 39b1bd03a6 issue-0038: closure free-var analysis skips FfiIntrinsicCall nodes
Surfaced while writing the Phase 1.11 in-construct test. The
closure free-variable analyzer doesn't recursively visit the
`ffi_intrinsic_call` AST node introduced in Phase 1.1, so any
identifier used inside `#objc_call` / `#jni_call` /
`#jni_static_call` from a closure body trips:

  error: unresolved: '<name>'

The same identifier captured from the same scope into a plain
expression resolves fine — so the bug is localized to whatever
recursive arm-walk powers the capture analysis.

Likely fix: add an `ffi_intrinsic_call => { ... }` arm wherever
the `.call =>` arm visits `callee` + `args`. Candidate files:
  - src/sema.zig (capture / scope tracking)
  - src/ir/lower.zig (closure body lowering / `lowerLambda`)
Both should be checked.

Workaround in the meantime: reach the captured value via a
module-level global from inside the closure body. See the
`g_hasher_recv` pattern in
examples/ffi-objc-call-09-in-construct.sx for an applied
instance.
2026-05-19 18:57:26 +03:00
..
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 19:44:20 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
ir
2026-02-28 18:03:38 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
...
2026-02-20 18:22:42 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 19:44:20 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-15 12:02:36 +02:00
2026-02-22 22:16:30 +02:00
2026-02-22 22:16:30 +02:00
2026-02-22 17:24:04 +02:00
2026-02-22 17:24:04 +02:00
2026-02-22 17:24:04 +02:00
2026-02-22 17:24:04 +02:00
2026-02-22 17:24:04 +02:00
ir
2026-02-28 18:03:38 +02:00
2026-02-23 13:45:44 +02:00
2026-02-23 13:45:44 +02:00
2026-02-25 15:51:22 +02:00
2026-02-25 15:51:22 +02:00
sm
2026-03-02 21:00:55 +02:00
sm
2026-03-02 21:00:55 +02:00
2026-02-15 19:44:20 +02:00
2026-03-04 17:12:56 +02:00
2026-03-05 16:20:36 +02:00
2026-03-05 16:20:36 +02:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-17 13:19:08 +03:00
2026-05-18 17:40:10 +03:00
2026-05-18 17:40:10 +03:00
2026-05-18 17:40:10 +03:00
2026-05-18 17:40:10 +03:00
2026-05-18 17:40:10 +03:00
2026-05-18 17:40:10 +03:00